Step-by-Step Guide to Quantity Takeoff
In a construction project, quantity takeoff is the process of measuring all the material and labour quantities which are an essential part of the project. Quantity takeoff takes a lot of precision and focus to be done because these quantities are used by contractors to make the estimate and bid preparation.
To further explain the process of quantity takeoff, let’s discuss all the steps involved in it.
Drawing Review
This is the first and most important step in quantity takeoff. Reviewing drawings and specifications gives you a complete understanding of the project. Before measuring quantities, the estimator carefully reviews all the construction drawings. The construction drawing includes:
- Architectural drawings
- Structural drawings
- Mechanical drawings
- Electrical drawings
- Plumbing drawings
In these drawings, there are some important factors to check, like drawing scale, revision date, material specification, and missing details or inconsistencies.
Divide the Project into Work Sections
A large and complex construction project contains thousands of items that need to be listed in a takeoff. To do it efficiently, the estimator divides the project into separate categories or work sections that are
- Site work
- Excavation
- Concrete
- Masonry
- Structural steel
- Carpentry
- Roofing and many others.
Breaking the project into these work sections makes the evaluation easier and reduces the chance of missing items.
Method for Quantity Takeoff
It involves two methods through which the total evaluation of materials is made. These two methods are:
Manual Takeoff
Manual takeoff is a traditional way to calculate the items or materials using printed drawings, a scale ruler, a calculator, coloured markers, and a spreadsheet. This method is time-consuming and sometimes is not accurate. The estimator measures dimensions directly from printed plans using an architectural or engineering scale.
Digital Takeoff
In the digital method, an estimator uses a digital tool or software to measure the quantity of the materials. There are plenty of construction estimating software to do quantity takeoffs. This software does takeoffs directly from uploaded drawings in PDF. It generates reports instantly. It is less time-consuming and more accurate.
Quantity Measurement
After getting the estimated number of materials and items, an estimator measures those components. Every construction material has its own measuring units in which these construction materials are measured. For example,
- Concrete is measured in cubic metres / cubic yards.
- Flooring in square feet or square meters
- Steel in tons or kilograms
The estimator uses measurement methods which are
- Linear measurement is used for pipes, conduits, beams and curbs. These are measured in feet or metres.
- Area measurement is used for flooring, roofing, painting, and ceiling work. These are measured in square feet or square meters.
- Volume measurement is used for concrete, excavation, and backfill. These are measured in cubic feet or cubic meters.
Including Waste Factors
During the calculation of the materials, an extra percentage of materials is to be added to the estimate. Some materials are lost due to cutting, breakage, handling damage, spillage, or installation error. The estimator adds a waste percentage to prevent material shortage. For example,
- Concrete 5-10%
- Tiles 10-15%
- Drywall 10%
- Steel 3-5%
These percentages depend on the construction project and its complexity.
Labour and Equipment Requirements
The labour and equipment requirements for a construction project are decided in this process of evaluation. Which determines the important component for a project.
Labour Requirements
The estimator determines the labour requirements on the basis of construction work. It determines
- Number of workers required for the construction project
- Labour hours for the completion of the project on time
- Productivity rates.
Equipment Requirements
The estimator also estimated all the equipment necessary for the construction project. This equipment includes machinery and other tools used in construction, for example.
- Excavator
- Cranes
- Concrete mixers
- Dump trucks and many other machinery
- Survey tools
- Drills and other construction equipment
Organising Quantities in the Takeoff Sheet
After measuring all the quantities, they are entered into a structured takeoff sheet or spreadsheet. These quantities are organised in proper columns, which will help in
- It will make it easy to review
- Better estimate presentation
- The pricing process can be done faster
- Well-organised sheets reduce confusion
Double-Check Measurements and Calculations
It is necessary to double-check the measurements and calculations so they do not cause a major financial problem. It is a critical step to review everything so far calculated and measured because it is important to find missing items if they have not been calculated or measured. This step will help in
- Find any missing items.
- Fix the double-counting error
- Wrong dimensions
- Incorrect unit of materials
- Compare drawings to ensure correct measurements
Estimators double-check measurements and calculations to ensure accuracy, which is important for a construction takeoff service and project.
Final Quantity Takeoff Report
After the verification of all measurements and calculations, the final quantity takeoff report is prepared. The final reports include
- Description of materials
- Units of measurements
- The total quantities
- Waste allowance
- Notes and assumptions
- Drawing references
The purpose of this final report is to calculate the cost estimation and to prepare for the bid. This will help in budget planning and project scheduling. This is why the accuracy of this final report matters because the total cost estimation of a project depends on it.
Conclusion
Quantity takeoff is a crucial step in construction estimating, as it determines the cost and budget for a project. The accuracy of quantity takeoff services can make a bid process profitable for contractors.
FAQs
Who performs quantity takeoff?
Quantity takeoffs are usually performed by an estimator, a quantity surveyor, contractors and construction cost consultants.
How long does a quantity takeoff?
The duration depends on the project size and complexity. Small residential projects may take a few hours, while large commercial projects can take several days.
What is the role of quantity takeoff in budgeting?
Quantity takeoff provides the material and labour quantities needed to calculate project costs and prepare a construction budget.